Product Details:
Minimum Order Quantity | 1 Litre |
Brand | Asian Paints |
Usage/Application | Metal |
Grade Standard | Industrial Grade |
Color | ALL COLOURS |
Packaging Size | 1 Ltr |
Packaging Type | Can |
Form | Liquid |
Coverage | 90-110 SQ.FT.PER.SQ.FT |
Country of Origin | Made in India |
PRECAUTIONSMineral Turpentine SHOULD NOT BE used in this product under any circumstances as it is not
compatible with this product.
Substrate temperature should be at least 3 °C above dew point but not above 50°C.
Relative humidity in the environment should be below 85%.
Good ventilation is required in confined areas to ensure proper curing.
For flat surfaces, it is recommended to work only with 2 sq. ft. area at a time so as to build
uniform film build up and also for better workability.
For optimum performance of the product, a minimum of 2 – 3 Coats by brushing would be
required to build necessary dry film thickness of 50 - 60 microns.
As with all epoxies, Apcolite Advanced 2-Pack Epoxy Finish will chalk and discolour on exterior
exposure. However, this is not detrimental to anti – corrosive performance. The actual
chalking will depend upon climatic conditions and will normally
be limited to a thin surface layer.
This product is not recommended for immersion services in acids, alkalies & solvents.
In case of new hot rolled steel substrate, it is essential to remove mill scale layer completely so
as to avoid premature coating failure.
SAFETY FEATURESRefer to the MSDS of Asian Paints Apcolite Advanced 2-Pack Epoxy Finish which gives
detailed information on safety measures while handling this product.
Store the product at ambient conditions in well ventilated locations and away from source of
ignition and fire.
Avoid eye and skin contact. In case of eye contact, wash with plenty of clean water.
Do not inhale or ingest. In case of inhalation move to fresh air and seek medical attention if the
systems persists in both cases.
Use protective equipments like rubber/polyethylene gloves, safety goggles and face mask
while handling the paint.
Stir well and strain before use
POST PAINTING CAREFor the best performance of the paint, ensure
proper washing and cleaning of all algal and
fungal growth, if any, at regular intervals of
six months
TECHNICAL DETAILSa. Recoat Time: Minimum 16 hours between
coats
b. Flash Point: > 24°C
c. Application Sheen Level: > 35 on 60° Gloss
Head